米乐 发表于 2014-6-24 22:12
, H ?8 C9 [. _: d- ^# X# m一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
6 V2 d" @1 s( UDid you ever follow up with the builder?* [2 o( K+ O, w
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
8 H. j0 G0 S* q2 JIt is too late to talk about this now.
, s/ E( R: P( K IIf you have everything documented, show it to the lawyer and ask for hold back.; H! N: W; V K9 W
. F% p! t I/ w/ t: T2 Z# S
If you can live with the wall, ask the builder to compensate you instead of removing the wall.
3 m; Q _1 z) w7 V7 hIt will be messy after you move in and they come back to take down the wall. |
|