埃德蒙顿华人社区-Edmonton China

 找回密码
 注册
查看: 2015|回复: 5

求助:与 builder 第一次 walk through 看些什么?

[复制链接]
鲜花(0) 鸡蛋(0)
发表于 2010-3-23 20:32 | 显示全部楼层 |阅读模式
老杨团队,追求完美;客户至上,服务到位!
新建房子的上下水管道和取暖通风系统已经装好,地下室和车库的水泥也灌注好了,马上要第一次 walk through。不知道应该看些什么?与 builder 谈些什么?Frame有没有什么需要注意看的地方?想请ceramistpalace和其他高人给点建议。先谢了!1 p0 P; t  z2 u# H! L
$ r0 E7 {4 R# Q' n" L+ u
另外,还有一个关于房顶shingle的问题。从照片上看,shingle下面没有加underlayer,是否OK?
) i3 e' l( d$ C/ V7 x) ]4 r8 N IMG_0095-1.JPG
鲜花(53) 鸡蛋(0)
发表于 2010-3-23 22:53 | 显示全部楼层
1# Flashtalk , @) |# _7 P& r$ d, j1 ?  g

, R; D" U0 `. L' R' c) PDid you make any changes to the original plan/spec, like adding a window, skylight or moving a wall or position of doors etc., etc.?; u8 N& n( ]0 T2 F5 c) c* u) `
For your other question regarding the roofing: tar paper or alike should be put in place before installation of shingles but the photo shows a small portion of the roof obviously has no tar paper underneath and I would guess the only reason they didn't do it is because that part is overshadowed by the main roof atop of it. No doubt it is always better to have underlay under every piece of shingles however not all trades have the same high moral principles /professionalism; if the guy think"that is no big deal", he'd rather save the few minutes not doing it. Talk to the builder of your concern and see if they would redo that part;(it's a small area anyway, hopefully they won't deny you)
鲜花(53) 鸡蛋(0)
发表于 2010-3-24 22:29 | 显示全部楼层
Not knowing what exactly progress is the interior finishing, a few things come to mind and the followings may be the least you can do:
1 T8 ?: ?/ g& P$ e# `7 d) N1/ check the electrical boxes for ceiling lights, see if they are positioned at the right spots you want, for example in the dining area, it should be over the middle of your dining table and not to one side of it.- Y& S1 W+ V1 S& U+ M( w
2/    look for floor area w/ squeaking sound when you walk on it; that is a sign which tell the subfloor is not holding to the joist tightly enough; ask the builder to reinforce it with additional screws, not nails. This problem will persist if you don't fix it before carpets/or tiles/or hardwood floor are installed.
$ |# k- D+ ~) q( j' P* u3/    check if enough screws are driven on drywalls installation (roughly one piece every 12 inches lengthwise along the wood studs)
大型搬家
鲜花(0) 鸡蛋(0)
发表于 2010-3-26 16:48 | 显示全部楼层
老杨团队 追求完美
在roof sheathing(看起来像plywood)和asphalt shingle之间应该铺eave protection,加上good roof insulation 来防范ice damming的发生
鲜花(0) 鸡蛋(0)
 楼主| 发表于 2010-4-2 21:23 | 显示全部楼层
看到房子里有市政府贴出的framing 不合格的菊红色的条子,上面写着:column#4 is supposed to be a“QT35120”,A “QT30108” has been installed, change it. column #3 is way out of plumb -fix it。请问这里的 column 号是指地下室的立柱吗?里面的代号 QTxxx 是什么意思?换起来是否很麻烦,需要很长的时间吗?谢谢了!
鲜花(53) 鸡蛋(0)
发表于 2010-4-2 22:11 | 显示全部楼层
Ask the builder if the re-inspection has passed or not, if the answer is yes, ask them to show/explain to you how the problems are fixed. OR look for a Re-inspection Passed label posted inside the house, probably next to the previous failed one.
您需要登录后才可以回帖 登录 | 注册

本版积分规则

联系我们|小黑屋|手机版|Archiver|埃德蒙顿中文网

GMT-7, 2024-12-3 13:42 , Processed in 0.123757 second(s), 16 queries , Gzip On, APC On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表